EMC D-VXR-DY-23 Dumps Updated Oct 22, 2024 WIith 345 Questions
View All D-VXR-DY-23 Actual Free Exam Questions Oct 22, 2024 Updated
NEW QUESTION # 207
An implementation engineer is in the validation phase of a VxRail deployment with two Dell EMC ToR switches.
Which command should they run on each of the ToR switches to validate that Link Aggregation has been configured according to Dell best practices for VxRail node interfaces?
- A. show port-channel summary
- B. show interface
- C. show interface status
- D. show network-policy profile
Answer: A
NEW QUESTION # 208
What is the Dell EMC recommendation for VxRail Management VLANs?
- A. Configure the VLAN ID with a default of 3940
- B. Use untagged traffic on the Native VLAN for the Public Management network
- C. Use tagged traffic on the Native VLAN for the Public Management network
- D. Configure the VLAN ID with a default of 1
Answer: B
NEW QUESTION # 209
Which functionality is provided by the VxRail vCenter plug-in - Physical View?
- A. Hardware alerts, LED indicator activation, and initiate power supply replacement
- B. BIOS and firmware versions, cluster shutdown, and initiate BIOS and firmware update
- C. LED indicator activation, initiate a disk replacement, and BIOS parameter change
- D. Hardware alerts, BIOS and firmware versions, and initiate a disk replacement
Answer: D
NEW QUESTION # 210
A planned VxRail deployment will use an external vCenter Server and syslog server.
Which ping connectivity tests should succeed and which should fail before the deployment?
- A. Succeed: VxRail Manager and syslog server
Fail: vCenter server and ESXi hosts - B. Succeed: vCenter server and syslog server
Fail: VxRail Manager and ESXi hosts - C. Succeed: VxRail Manager and ESXi hosts
Fail: vCenter server and syslog server - D. Succeed: ESXi hosts and syslog server
Fail: VxRail Manager and vCenter server
Answer: A,B
NEW QUESTION # 211
A systems engineer notices that a VxRail host that previously appeared in a cluster within vCenter is now disconnected and is not responding. The VMs that were running on that host have been recovered on other available hosts.
What initial action needs to be done to resolve the issue?
- A. Review event logs for errors and perform root cause analysis
- B. Generate the appropriate SolVe procedure and follow it
- C. Use iDRAC to check the physical state of the nodes
- D. Apply the latest updates on the host
Answer: B
NEW QUESTION # 212
What is a characteristic of the VxRail S Series node?
- A. Large form factor drives
- B. Dense Flash disks
- C. Form factor of 2U4N
- D. Form factor of 1U1N
Answer: D
NEW QUESTION # 213
After finishing the rack and stack of a fully populated VxRail G560 chassis, in what sequence should the nodes be powered on?
- A. All four nodes at the same time
- B. Must be in the following order: 1, 2, 3, 4
- C. Any order - sequence is not important
- D. Must be in the following order: 4, 3, 2, 1
Answer: C
NEW QUESTION # 214
Which tool is required to re-image a VxRail G560F system?
- A. RASR
- B. MBS
- C. POST
- D. BOSS
Answer: A
NEW QUESTION # 215
An implementation engineer is tasked with setting up RecoverPoint for VMs on a 5-node V570F cluster.
How many VMs are licensed to be protected on the cluster?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: C
NEW QUESTION # 216
For which VxRail model must the iDRAC NIC Selection be set to LOM1?
- A. D Series
- B. E Series
- C. G Series
- D. S Series
Answer: C
NEW QUESTION # 217
You are expanding the capacity of a Hybrid VxRail by creating an additional disk group. The new disk group will be composed of five drives on all participating cluster nodes.
When you attempt to add the new disks to the vSAN datastore you receive an error message about there being no cache tier available.
What is the likely cause?
- A. Cluster requires vSAN Advanced or Enterprise license upgrade
- B. vSAN supports disk groups with four drives or fewer
- C. All the drives are labeled as HDDs
- D. You attempted to add the disks to the existing disk group
Answer: C
NEW QUESTION # 218
What is a Dell EMC converged platform product?
- A. Vblock/VxBlock
- B. Vscale Architecture
- C. VxRack
- D. VxRail
Answer: A
NEW QUESTION # 219
The vCenter managing a VxRail cluster must be able to support both Enhanced Linked Mode and vSAN Encryption.
What is the correct configuration to satisfy this requirement?
- A. External vCenter Embedded PSC
- B. External vCenter External PSC
- C. Embedded vCenter Embedded PSC
- D. Embedded vCenter External PSC
Answer: B
NEW QUESTION # 220
How many nodes can be added simultaneously to an existing VxRail cluster running at code version 4.5?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: C
NEW QUESTION # 221
What step is a best practice in the deployment process of a VxRail Appliance with an External vCenter server?
- A. Create VxRail Management user in SSO with administrative privileges
- B. Create VxRail Configuration user in SSO with no role assigned
- C. SSH to the default IP address of the VxRail Manager VM to set the required IP address
- D. Connect to DCUI to set vLAN tagging on ESXi hosts
Answer: C
NEW QUESTION # 222
From what location should NVT for VxRail be run?
- A. VxRail network Top of Rack switch
- B. Workstation on the same network as VxRail Manager
- C. Laptop connected to the first VxRail ESXi node
- D. Jump server on a different network
Answer: B
NEW QUESTION # 223
You are designing a VxRail Stretched Cluster for a company with two datacenters. The primary datacenter will host all the workloads; the secondary datacenter will be for disaster recovery.
Where should you host the witness virtual appliance?
- A. Primary datacenter only
- B. Cloud
- C. Secondary datacenter only
- D. Both datacenters
Answer: B
NEW QUESTION # 224
An implementation engineer is expanding an existing VxRail E Series cluster with an additional node The version of the node is not at the current cluster level and is not compatible.
What action must be performed before adding the node?
- A. Order node with correct image
- B. Compute node expansion
- C. RASR Factory Reset
- D. RASR Factory Image Upgrade
Answer: A
NEW QUESTION # 225
Refer to the exhibit, which shows a red box around a node name.
What is a characteristic of the node marked by the red box?
- A. There are three VxRail nodes that can be discovered by the VxRail Deployment Wizard.
- B. The VxRail node is running DNS and NTP.
- C. The selected VxRail is Node 1 and VxRail Manager VM is running on this node.
- D. The selected VxRail is Node 3 and VxRail Manager VM is running on this node.
Answer: C
NEW QUESTION # 226
A systems engineer needs to check the health of the nodes and the system VMs to prevent complications or failures during VxRail upgrades.
Which tool must be used to perform the task?
- A. VxVerify
- B. VxRail ACE
- C. SolVe Online
- D. CloudlQ
Answer: A
NEW QUESTION # 227
......
New D-VXR-DY-23 Exam Questions Real EMC Dumps: https://www.trainingquiz.com/D-VXR-DY-23-practice-quiz.html
Pass Authentic EMC D-VXR-DY-23 with Free Practice Tests and Exam Dumps: https://drive.google.com/open?id=16smb-WlOmsurTOhW3FeTd432VoJKBhGB

