NEW QUESTION # 98
An SE is building a solution for a federal goverment prospect that u???
Which two items are required to deliver a solution that meens the ??? encryption (choose two)

  • A. Nutanix Acropolis Pro Licensing
  • B. Self-Encrypting Drives
  • C. Nutanix Software Encryption
  • D. A supported Key Management Server

Answer: B,C


NEW QUESTION # 99
A customers current AHV cluster for mixed server workloads consists of 7 NX-3060-G6 nodes with Intel Skylake processors spread across two blocks. Growing demand for resources requires the customer to order three additional NX-3060 G7 nodes with Intel Cascade Lake processors.
Which supported approach allows the customer the most efficient use of their additional resources?

  • A. Create a new cluster using a new block populated by the three additional nodes.
  • B. Expand the cluster by fully populating the existing blocks, and adding a new block populated with two nodes.
  • C. Expand the editing cluster by adding a new block populated with the three additional nodes
  • D. Expand the cluster by fully populating the existing blocks with the three additional nodes.

Answer: C


NEW QUESTION # 100
When creating a multi-cluster scenario in Sizer, what does the Summary Failover Capacity indicator (N+0, N+1) display?

  • A. N+0, if the RAM utilization for all cluster in the scenario.
  • B. The indicator shows the worst resiliency level of any cluster in the scenario
  • C. The indicator shows the best resiliency level of any cluster in the scenario
  • D. N+0, if the CPU utilization for all clusters falls below N+1 resiliency.

Answer: C


NEW QUESTION # 101
A customer asks for a quote for a hybrid cluster to run general purpose VMs and an ERP application. The customer has a vSAN ReadyNode quote already and is looking for a comparable Nutanix solution. They share the following bill of materials: 3 Hosts , 2x E5-2640v4 CPUs , 512GB RAM , 1 x 480GB SSD , 2 x 8TB HDD
, 2 x 1GB NIC What are two reasons to avoid sizing to match a competitor's bill of materials ? (Choose two)

  • A. The assumptions made in the competitor's sizing cannot be determined.
  • B. Nutanix Collector is better at capturing the metrics needed
  • C. There is no visibility to the actual customer requirement
  • D. Sizing data from the competition was shared.

Answer: A,C


NEW QUESTION # 102
An SE builds a sizer scenario for a prospect's remote site running on an NX-1365S-G5.
Using only the sizer BOM. which two actions can be performed? (Choose two.)

  • A. Review power consumption requirements
  • B. Review applicable discounts from deal registration
  • C. Reference the HCL for additional SKUs relevant to the configuration
  • D. Review budgetary pricing
  • E. Review workload sizing details

Answer: C,E


NEW QUESTION # 103
An administrator needs to relocate an AHV cluster to a new datacenter during a maintenance windows. The cluster will use the same IPs in the new datacenter.
Which two steps should be taken to prepare for this task? (Choose Two)

  • A. Reconfigure IPMI for the new datacenter.
  • B. Stop all Nutanix Files clusters
  • C. Shut down all user VMs in the cluster
  • D. Relocate the linked LDAP server

Answer: B,C


NEW QUESTION # 104
In the event of a primary datacenter failure. a customer wants to power on virtual machines in a secondary datacenter with an RPO and RTO of no more than 15 minutes. Upon further discussions with the customer. the systems engineer (SE) finds that round trip latency between the 2 sites ca reach up to 6ms Which Nutanix feature should the SE recommend?

  • A. NearSync
  • B. Metro Availability
  • C. Fault Tolerance FT1
  • D. Rack Awareness

Answer: A


NEW QUESTION # 105
A prospective customer uses both Oracle and Microsoft products for critical applications The prospect prefers an all flash array over HCI, because they have made a recent, significant investment in physical servers for their Oracle environment to save on licensing costs.
Which feature should be discussed to address this objection?

  • A. VM Flash Mode
  • B. AHV
  • C. Hyper-V support
  • D. Volumes

Answer: D


NEW QUESTION # 106
A large retailer company recently employed a CIO who decided that all operations should be migrated to public cloud offerings. After 7 months, the project was be a failure and determined to the CIO exited. The retailer's infrastructure consisted of tens of thousand's of VMs on thousands of hosts supported by dozen of storage arrays. Only 10% of workloads were migrated to public cloud during the CIO's tenure.
Which open ended discovery questions should the SE ask to determine pain points or gaps? (Choose two)

  • A. Which public cloud offering(s) are utilized?
  • B. What are your end users asking for that you cannot deliver today?
  • C. What challenges triggered the public cloud initiative?
  • D. Is de-duplication q requirement for your workloads?

Answer: A,C


NEW QUESTION # 107
An SE needs to leverage Change Block Tracking when using Xtract to migrate VMs from ESXi to AHV.
Which two source VM requirements should the SE verify? (Choose two)

  • A. Nutanix Guest Tools installed.
  • B. Minimum guest OS version
  • C. VMware Tools installed
  • D. Virtual hardware version

Answer: A,B


NEW QUESTION # 108
74. A VP of Applications at a prospective customer is working to transform IT from a cost, center to a business enabler. In order to address this initiative, the VP has identified the following areas for improvement:
Increased time and expenses related to meeting business deliverables Missed market opportunity due to slow IT response time Shadow IT increases risk of security breaches and brand damage Unplanned spend on public cloud services (AWS) what two key benefits should the SE review to address the customer's challenges?
(Choose two)

  • A. Provide a hardened and secured solution that can inherently block Shadow IT.
  • B. Provide developers with a native and integrated Self Service Portal that can scale on demand.
  • C. Deliver enhanced performance for resource intensive applications.
  • D. Deliver an on-premises solution with an out-of-the-box cloud like experience.

Answer: A,B


NEW QUESTION # 109
When Discussing node failures. a customer raises the concern that if a node that host 100TB of data goes offline. building data must take an extended period of time

  • A. Support for all-flash or NVMe platforms
  • B. Use of redundant hypervisor boot-drives
  • C. Leveraging a replication-factor of 3
  • D. Distribution of rebuild tasks across all nodes

Answer: D


NEW QUESTION # 110
Which two items are considered by Sizer when calculating the required cluster resources with only the Raw input workload type for a multi-VM workload? (Choose two)

  • A. The vCPU:pCore ratio applied to all VMs
  • B. Large VM NUMA requirements
  • C. The required RAM for the CVM
  • D. The vCPU:pCore ratio applied for specific VMs

Answer: A,C


NEW QUESTION # 111
when reviewing Nutanix cluster upgrades. a customer engineer is concerned that their VM will be forced to repeatedly migrate between nodes. Which Nutanix feature allows VMs to remain on a host during an AOS upgrade?

  • A. Shadow Clones
  • B. RF3
  • C. CVM Autopathing
  • D. Data Locality

Answer: C


NEW QUESTION # 112
Which three configuration scenarios are valid for the deployment of Prism Central? (Choose three.)

  • A. Environments use Network Address Translation.
  • B. Prism Elements and Prism Central have proxy configured.
  • C. Prism Elements and Prism Central art in different subnets.
  • D. Environments use the 192.168.5.0/24 CVM management network.
  • E. Environments do not have Internet access.

Answer: A,D,E


NEW QUESTION # 113
A prospective customer asks about failure handing. They have heard all HCI is the same and want to know what happens if 2 nodes fail within 1 hour of each other. if there is capacity in the cluster, how will this failure scenario be handled ?

  • A. Every block of data is written to every node in a Nutanix cluster
  • B. Nutanix begins rebuilds immediately on a failure.
  • C. The Nutanix RAID array will leverage the hot spare.
  • D. Nutanix waits 60 minutes to recover from failures; data loss may occur

Answer: B


NEW QUESTION # 114
A customer needs to image nodes that are either bare metal or require a different hypervisor. Which Nutanix tool should be used?

  • A. Prism Central
  • B. Era
  • C. Foundation
  • D. Move

Answer: C


NEW QUESTION # 115
What are two key Nutanix value propositions? (Choose two)

  • A. Highest performance across all workload types
  • B. Lowest initial cost than a comparable competitive HCI or 3-tier solution
  • C. Rapid time to value
  • D. One-Click Infrastructure Management

Answer: B,D


NEW QUESTION # 116
In which scenario should shadow clones be explicitly disabled?

  • A. when deploying Splunk
  • B. when deploying Citrix virtual desktops
  • C. when deploying Horizon View virtual desktops
  • D. when deploying an Oracle RAC database

Answer: D


NEW QUESTION # 117
......

NCSE-Core Real Exam Questions and Answers FREE: https://www.trainingquiz.com/NCSE-Core-practice-quiz.html